A treat for lovers of the underground queue in Warsaw. This Sunday, June 17, an open day was planned for the construction of the second metro line. Willing visitors will be able to visit the Target station. We suggest what conditions must be met in order to be able to go underground.
Target station is being built at the intersection in Warsaw. On Sunday, June 17, those willing can learn about its secrets. The station will be open to visitors from 10-15.
"Guests will go down the unfinished entrance to level -1, i.e. the mezzanine, and then to level -2, i.e. the platform. You will be able to see, among others, how the track is built, technical installations of the underground railway are assembled, as well as the underground turnout hall , that is what you cannot see when the metro is already running "- explains Barros, spokesman for the Metropolitan City Hall.
The condition for participation in the event is to bring a printed and signed regulations, which can be found on this page. Entrance to the station area. Due to the state of the construction stage, it was not possible to prepare a route for the needs of people with disabilities, wheelchair users and children who need to be transported.
Importantly, visitors cannot be under the influence of alcohol or drugs. A proper outfit is also required - covered boots on a hard sole, long trousers, a protective helmet and a reflective vest that participants will receive at the construction site. The Contractor has the right to refuse entry to a person who does not meet these conditions, as well as to continue the trip to guests who ignore his requests and commands.
No comments:
Post a Comment